B95W
Transport
08_Transport_en.fm - V1.0 - 1.8.17
267 / 306
8
27
Securing the machine
Empty the dipper and fold it in.
Position the work equipment to be pointing straight ahead.
Rotate the uppercarriage so that the working direction is opposite to the
dozer blade in the “straight ahead” position.
Raise the boom to the specified (Fig. 8-5) height.
Retract the dipperstick.
Retract the intermediate boom.
Raise the support device/dozer blade right up.
Shut down the engine.
Leave the machine and close the door.
Lifting the machine
Attach the machine to the 3-point lifting gear at the points illustrated (Fig. 8-5)
in the correct manner
Ensure correct fastening of the crane lifting harness.
Carefully and smoothly lift the machine.
Notice
Pay attention to the correct length with 3-point lifting gear, as otherwise the
machine can be damaged.
Summary of Contents for B95W
Page 2: ......
Page 8: ...B95W Table of contents 6 306 1 01_Inhaltsverzeichnis_enIVZ fm V1 0 1 8 17 10 ...
Page 52: ...B95W Description 50 306 5 05_Beschreibung_en fm V1 0 1 8 17 11 ...
Page 58: ...B95W Description 56 306 5 05_Beschreibung_en fm V1 0 1 8 17 11 ...
Page 206: ...B95W Maintenance 204 306 6 06_Wartung und Pflege_en fm V1 0 1 8 17 20 ...
Page 208: ...B95W Operation 206 306 7 07_Bedienung_en fm V1 0 1 8 17 26 ...
Page 272: ...B95W Transport 270 306 8 08_Transport_en fm V1 0 1 8 17 27 ...
Page 302: ...B95W Troubleshooting 300 306 10 10_Fehlerbeseitigung_en fm V1 0 1 8 17 30 ...
Page 309: ......