B95W
Maintenance
06_Wartung und Pflege_en.fm - V1.0 - 1.8.17
191 / 306
6
20
Check slewing break
Fig. 6-39 Check slewing break
1
Digging tool straightened
2
Uppercarriage at 45°
Park vehicle on level, solid ground.
Raise vehicle fully using the support function.
Adjust digging tool for maximum reach (1).
Retract bucket.
Turn uppercarriage by 45° (2).
Retract bending cylinder fully.
Lower digging tool until the bucket is floating around 10 cm above the ground.
Align the side edge of the bucket/building tool with a reference point in your
environment. Remember this point of reference.
Stop the engine.
Wait one minute (machine operator must not leave the machine).
Look at the reference point during this waiting period (one minute).
If the building tool has not moved from its alignment with the point of reference,
the excavator may be operated further.
If the building tool has moved out of alignment with the reference point, cease
operations as the excavator is not in a usable condition, and contact an
authorized specialist workshop.
1
2
Summary of Contents for B95W
Page 2: ......
Page 8: ...B95W Table of contents 6 306 1 01_Inhaltsverzeichnis_enIVZ fm V1 0 1 8 17 10 ...
Page 52: ...B95W Description 50 306 5 05_Beschreibung_en fm V1 0 1 8 17 11 ...
Page 58: ...B95W Description 56 306 5 05_Beschreibung_en fm V1 0 1 8 17 11 ...
Page 206: ...B95W Maintenance 204 306 6 06_Wartung und Pflege_en fm V1 0 1 8 17 20 ...
Page 208: ...B95W Operation 206 306 7 07_Bedienung_en fm V1 0 1 8 17 26 ...
Page 272: ...B95W Transport 270 306 8 08_Transport_en fm V1 0 1 8 17 27 ...
Page 302: ...B95W Troubleshooting 300 306 10 10_Fehlerbeseitigung_en fm V1 0 1 8 17 30 ...
Page 309: ......