
CABLE ROUTING
2-64
1. Right handlebar switch lead
2. Headlight sub-wire harness
3. Right radiator fan motor lead
4. AC magneto lead
5. Atmospheric pressure sensor
6. Throttle position sensor (for throttle cable
pulley)
7. Throttle servo motor
8. O
2
sensor lead
9. Rear brake light switch lead
10.Ignition coil lead
11.Crankshaft position sensor lead
12.Joint coupler
13.Coolant reservoir hose
14.Starter motor lead
15.Battery negative lead
16.Fuel hose
17.Sidestand switch lead
18.Oil level switch lead
19.Gear position sensor lead
20.Rear speed sensor lead
21.Secondary injector sub-wire harness
22.Throttle sub-wire harness
23.Intake funnel servo motor lead
24.Throttle position sensor (for throttle valves)
25.Left handlebar switch lead
26.Front speed sensor lead
27.Intake air pressure sensor
28.Immobilizer unit lead
29.Radiator stay
30.Frame boss
31.Clutch cable
32.Hazard switch lead
33.Stay 1
34.Main harness
35.Main switch lead
36.Steering damper lead
A. Fasten the clutch cable, right handlebar
switch lead and hazard switch lead to
inside of the radiator stay with the clamp
aligning to their white tape marks.
B. After connecting the main harness and
headlight sub-wire harness, insert them
into the rectifier/regulator bracket stay.
C. To the radiator
D. Route the coolant reservoir hose, main
harness and AC magneto lead in this order
from the top. Each of them can either be
right or left.
E. Route the crankshaft position sensor lead
through the heat protector hole and to right
of the engine.
F. Route the coolant reservoir hose in front of
the crankcase breather hose and to the
coolant reservoir tank. Route it as shown in
the illustration and it should not touch the
air bleed hose clip.
G. Fasten the main harness and fuel hose
between the breather hose and the main
harness (such as the ground lead). Route
the fuel hose on the side of the main har-
ness facing toward rear of the vehicle.
H. Route the main harness behind the crank-
case breather hose.
I. Fasten the starter motor lead and fuel
pump lead at the right of the vehicle. Do
not cut off the end and face it to back of the
vehicle.
J. Route the starter motor lead below the fuel
tank breather hose and fuel tank overflow
hose, back of the fuel hose and above the
ground lead and battery negative lead.
K. Install with the ground lead at the bottom
and the battery negative lead on the top.
Install the rivet of the each lead facing up.
Angle of installing each lead is shown in
the illustration.
L. Route the fuel pump lead through front of
the fuel tank breather hose.
M. Route the sidestand switch lead outside of
the installation dotted line at the back of the
coolant reservoir tank.
N. Connect the oil level switch lead, gear posi-
tion sensor lead, rear speed sensor lead
and sidestand switch lead (order insignifi-
cant) and put the connector cover on.
O. To the AC magneto
P. To the coolant reservoir tank
Q. The intake funnel servo motor lead can
either be on top or bottom of the branched
secondary injector sub-wire harness and
throttle sub-wire harness.
R. To the throttle body
S. To the air filter case
T. To the intake funnel servo motor
U. Fasten the front speed sensor lead, left
handlebar switch lead and main harness
within the range shown in the illustration
(between the ECU (engine control unit)
bracket rib and radiator core).
V. Route the left handlebar switch lead and
front speed sensor lead along the main
harness, making sure there is no slack in
the leads.
W. Align the main switch lead (white), left han-
dlebar switch lead (at the positioning tape)
and steering damper lead (white) to the
tapes and clamp them inside of the radiator
stay.
X. End of the clamp should be at front and
facing down.
Y. Route the hazard switch lead on the side of
the clutch cable facing toward front of the
vehicle.
Summary of Contents for YZF-R1 2012
Page 1: ...SERVICE MANUAL YZF R1 B 2012 1KB 28197 E0 ...
Page 6: ......
Page 8: ......
Page 70: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29 EAS20410 LUBRICATION DIAGRAMS ...
Page 72: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31 ...
Page 74: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 33 ...
Page 76: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 35 ...
Page 77: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 36 1 Main axle 2 Oil water pump assembly ...
Page 78: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 37 ...
Page 79: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 38 1 Main axle 2 Oil delivery pipe 2 3 Drive axle ...
Page 80: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39 ...
Page 82: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 41 ...
Page 84: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 43 ...
Page 85: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 44 1 Balancer shaft 2 Crankshaft ...
Page 86: ...COOLING SYSTEM DIAGRAMS 2 45 EAS20420 COOLING SYSTEM DIAGRAMS ...
Page 88: ...COOLING SYSTEM DIAGRAMS 2 47 ...
Page 89: ...COOLING SYSTEM DIAGRAMS 2 48 1 Radiator cap 2 Radiator 3 Radiator fan 4 Oil cooler ...
Page 90: ...CABLE ROUTING 2 49 EAS20430 CABLE ROUTING ...
Page 92: ...CABLE ROUTING 2 51 ...
Page 94: ...CABLE ROUTING 2 53 ...
Page 96: ...CABLE ROUTING 2 55 ...
Page 98: ...CABLE ROUTING 2 57 ...
Page 100: ...CABLE ROUTING 2 59 ...
Page 102: ...CABLE ROUTING 2 61 ...
Page 104: ...CABLE ROUTING 2 63 ...
Page 106: ...CABLE ROUTING 2 65 ...
Page 108: ...CABLE ROUTING 2 67 ...
Page 110: ...CABLE ROUTING 2 69 ...
Page 112: ...CABLE ROUTING 2 71 ...
Page 114: ...CABLE ROUTING 2 73 ...
Page 116: ...CABLE ROUTING 2 75 ...
Page 119: ......
Page 156: ...PERIODIC MAINTENANCE 3 37 ...
Page 248: ...CHAIN DRIVE 4 89 ...
Page 263: ...ENGINE REMOVAL 5 12 Installed depth of gasket c 3 5 mm 0 14 in ...
Page 295: ...PICKUP ROTOR 5 44 Yamaha bond No 1215 Three Bond No 1215 90890 85505 ...
Page 350: ...TRANSMISSION 5 99 ...
Page 366: ...WATER PUMP 6 15 ...
Page 388: ...AIR INDUCTION SYSTEM 7 21 EAS27040 AIR INDUCTION SYSTEM ...
Page 394: ...AIR INDUCTION SYSTEM 7 27 ...
Page 397: ......
Page 398: ...IGNITION SYSTEM 8 1 EAS27090 IGNITION SYSTEM EAS27110 CIRCUIT DIAGRAM ...
Page 404: ...ELECTRIC STARTING SYSTEM 8 7 EAS27160 ELECTRIC STARTING SYSTEM EAS27170 CIRCUIT DIAGRAM ...
Page 410: ...CHARGING SYSTEM 8 13 EAS27200 CHARGING SYSTEM EAS27210 CIRCUIT DIAGRAM ...
Page 413: ...CHARGING SYSTEM 8 16 ...
Page 414: ...LIGHTING SYSTEM 8 17 EAS27240 LIGHTING SYSTEM EAS27250 CIRCUIT DIAGRAM ...
Page 418: ...SIGNALING SYSTEM 8 21 EAS27270 SIGNALING SYSTEM EAS27280 CIRCUIT DIAGRAM ...
Page 425: ...SIGNALING SYSTEM 8 28 ...
Page 426: ...COOLING SYSTEM 8 29 EAS27300 COOLING SYSTEM EAS27310 CIRCUIT DIAGRAM ...
Page 429: ...COOLING SYSTEM 8 32 ...
Page 430: ...FUEL INJECTION SYSTEM 8 33 EAS27330 FUEL INJECTION SYSTEM EAS27340 CIRCUIT DIAGRAM ...
Page 503: ...FUEL INJECTION SYSTEM 8 106 ...
Page 504: ...FUEL PUMP SYSTEM 8 107 EAS27550 FUEL PUMP SYSTEM EAS27560 CIRCUIT DIAGRAM ...
Page 508: ...IMMOBILIZER SYSTEM 8 111 EAS27640 IMMOBILIZER SYSTEM EAS27650 CIRCUIT DIAGRAM ...
Page 517: ...IMMOBILIZER SYSTEM 8 120 ...
Page 518: ...ELECTRICAL COMPONENTS 8 121 EAS27972 ELECTRICAL COMPONENTS ...
Page 520: ...ELECTRICAL COMPONENTS 8 123 ...
Page 522: ...ELECTRICAL COMPONENTS 8 125 EAS27980 CHECKING THE SWITCHES ...
Page 546: ...ELECTRICAL COMPONENTS 8 149 ...
Page 553: ......
Page 554: ......