5 - 40
CHAS
EC5B0000
HANDLEBAR
Extent of removal:
1
Handlebar removal
Extent of removal
Order
Part name
Q’ty
Remarks
Preparation for removal
HANDLEBAR REMOVAL
Number plate
Remove the clamp portion only.
1
Decompression cable
1
Disconnect at the lever side.
2
Decompression lever holder
1
3
Clutch cable
1
Disconnect at the lever side.
4
Clutch lever holder
1
5
Engine stop switch
1
6
Brake master cylinder
1
Refer to “REMOVAL POINTS”.
7
Throttle cable cap
1
8
Throttle cable #2 (pushed)
1
Disconnect at the throttle side.
9
Throttle cable #1 (pulled)
1
Disconnect at the throttle side.
10
Right grip
1
Refer to “REMOVAL POINTS”.
11
Tube guide
1
12
Grip cap cover
1
13
Collar
1
14
Left grip
1
Refer to “REMOVAL POINTS”.
15
Handlebar upper holder
2
16
Handlebar
1
1
HANDLEBAR