ENG
Disassembly of engine
1.
Disassemble
Main axle
Inner pushing rod of cl
u
tch
2
Dri
v
ing axle
Washer
Pushing rod of clutch
3.
:
Disassemble
Idle switch
Disassembly of crank and balance
1.
Disassem
:
le
b
Balance block
Crank
Disassemble with disassembling tool of crank .
90890-01135
Disassembling tool of crank:
Tighten up the supporting bolt of disassembling tool,
but ensure the tool body vertical to crank. When
cessary, screw a screw back ward a little to ca-
librate the tool body state.
Never beat the crank directly with hammer etc .
Note:
ne
4 - 14
Summary of Contents for YBR125 Custom
Page 4: ......
Page 12: ...1 GEN INFO ...
Page 13: ...1 GEN INFO ...
Page 15: ...1 GEN INFO ...
Page 16: ...1 GEN INFO ...
Page 18: ...2 2 2 YAMALUBE four strokeSAE20W40SF or SAE10W30SF machine oil Machine oil type Engine oil ...
Page 21: ... 4 950 4 935 2 0 08 0 12mm 0 10 0 14mm ...
Page 22: ...5 000 5 012mm 5 000 5 012mm 0 010 0 037mm 0 025 0 052mm 2 ...
Page 23: ...2 ...
Page 25: ...2 7 N ...
Page 32: ...2 ...
Page 34: ...2 Layout of cable pipline Drum type without fairing ...
Page 36: ...2 Layout of cable pipline Disc type with fairing ...
Page 37: ...2 Layout of cable pipline Disc type without fairing ...
Page 111: ...Assembling and adjustment of engine ENG 3 Mount Camshaft 4 Mount Pressing plate Bolt 4 42 ...
Page 177: ...Circuit ELEC Circuit Drawing 7 7 1 ...
Page 213: ...Signal system ELEC 7 37 ...
Page 215: ......
Page 218: ...Troubleshooting of engine Trouble Intake and exhaust system 8 3 ...