
Crankcase(Right)
1.
Application
Seal gum
(Apply to the linking surface of left and right crankcase)
2.
3.
Installation:
Dowel pin
Installation
Install the right crankcase to the left crankcase
6.
7.
→
Application
Engine oil of
4
stroke engine
(Apply to the crankshaft pin,bearing and crankshaft hole
Inspection:
Action of crankshaft and transmission.
The action is not smooth repair
5.
Fastening:
Screw(crank case)
Seal gum(Yamaha bonder No.1215)
90890-85505
Note:
Never allow any seal gum to enter into the lubricati-
on oil hole
Note:
Before installing and fastening the fastening screws
of cranrcase, be sure to turn the shift cam with hand
to check if the transmission functions normally.
Note:
From the screw marked with the Minnumber, tighten
up the screws orderly.
·
Assembling and adjustment of engine
ENG
4-50
Summary of Contents for YBR125 Custom
Page 4: ......
Page 12: ...1 GEN INFO ...
Page 13: ...1 GEN INFO ...
Page 15: ...1 GEN INFO ...
Page 16: ...1 GEN INFO ...
Page 18: ...2 2 2 YAMALUBE four strokeSAE20W40SF or SAE10W30SF machine oil Machine oil type Engine oil ...
Page 21: ... 4 950 4 935 2 0 08 0 12mm 0 10 0 14mm ...
Page 22: ...5 000 5 012mm 5 000 5 012mm 0 010 0 037mm 0 025 0 052mm 2 ...
Page 23: ...2 ...
Page 25: ...2 7 N ...
Page 32: ...2 ...
Page 34: ...2 Layout of cable pipline Drum type without fairing ...
Page 36: ...2 Layout of cable pipline Disc type with fairing ...
Page 37: ...2 Layout of cable pipline Disc type without fairing ...
Page 111: ...Assembling and adjustment of engine ENG 3 Mount Camshaft 4 Mount Pressing plate Bolt 4 42 ...
Page 177: ...Circuit ELEC Circuit Drawing 7 7 1 ...
Page 213: ...Signal system ELEC 7 37 ...
Page 215: ......
Page 218: ...Troubleshooting of engine Trouble Intake and exhaust system 8 3 ...