Assembling and adjustment of engine
ENG
4
5
.Installation:
Washer
Starting gear
.Installation:
Woodruff
Rotor
Note:
Before installing clean off the foreign matter and dirt
on the rotor.
6.Locking:
Nut
Fastening torque
7.0Kgf.m(70N.m)
Note:
Fasten the rotor with slide retaining tool , lock
the rotor with a nut with washer.
Slide retaining tool:
90890-01701
7.Installation:
Dowel pin
Paper gasket(new product)
Left crankcase cover
Fastening torque of crankcase cover:
1.0Kgf.m(10N.m)
Note:
The left crankcase can be installed only after the lo-
cking nut of main drive gear of right crankcase has
been installed.
4-61
Summary of Contents for YBR125 Custom
Page 4: ......
Page 12: ...1 GEN INFO ...
Page 13: ...1 GEN INFO ...
Page 15: ...1 GEN INFO ...
Page 16: ...1 GEN INFO ...
Page 18: ...2 2 2 YAMALUBE four strokeSAE20W40SF or SAE10W30SF machine oil Machine oil type Engine oil ...
Page 21: ... 4 950 4 935 2 0 08 0 12mm 0 10 0 14mm ...
Page 22: ...5 000 5 012mm 5 000 5 012mm 0 010 0 037mm 0 025 0 052mm 2 ...
Page 23: ...2 ...
Page 25: ...2 7 N ...
Page 32: ...2 ...
Page 34: ...2 Layout of cable pipline Drum type without fairing ...
Page 36: ...2 Layout of cable pipline Disc type with fairing ...
Page 37: ...2 Layout of cable pipline Disc type without fairing ...
Page 111: ...Assembling and adjustment of engine ENG 3 Mount Camshaft 4 Mount Pressing plate Bolt 4 42 ...
Page 177: ...Circuit ELEC Circuit Drawing 7 7 1 ...
Page 213: ...Signal system ELEC 7 37 ...
Page 215: ......
Page 218: ...Troubleshooting of engine Trouble Intake and exhaust system 8 3 ...