
Steering shaft and handle bar
CHAS
Installation of the handle bar
1.Install
Handle bar
Handle bar clamp
Coupling torque
2.3Kgf.m(23N.m)
Note:
The bolt ahead must be fastened first.
When assembling the steering, the projection of
handle bar clamp is in front of installation direction.
2.Install:
Front brake lever
Clutch lever
3.Install
Lever switch
When installing,locating pin a of the lever switch sh-
ould be inserted into the locating hole b of the handle
bar.
6-31
Summary of Contents for YBR125 Custom
Page 4: ......
Page 12: ...1 GEN INFO ...
Page 13: ...1 GEN INFO ...
Page 15: ...1 GEN INFO ...
Page 16: ...1 GEN INFO ...
Page 18: ...2 2 2 YAMALUBE four strokeSAE20W40SF or SAE10W30SF machine oil Machine oil type Engine oil ...
Page 21: ... 4 950 4 935 2 0 08 0 12mm 0 10 0 14mm ...
Page 22: ...5 000 5 012mm 5 000 5 012mm 0 010 0 037mm 0 025 0 052mm 2 ...
Page 23: ...2 ...
Page 25: ...2 7 N ...
Page 32: ...2 ...
Page 34: ...2 Layout of cable pipline Drum type without fairing ...
Page 36: ...2 Layout of cable pipline Disc type with fairing ...
Page 37: ...2 Layout of cable pipline Disc type without fairing ...
Page 111: ...Assembling and adjustment of engine ENG 3 Mount Camshaft 4 Mount Pressing plate Bolt 4 42 ...
Page 177: ...Circuit ELEC Circuit Drawing 7 7 1 ...
Page 213: ...Signal system ELEC 7 37 ...
Page 215: ......
Page 218: ...Troubleshooting of engine Trouble Intake and exhaust system 8 3 ...