CABLE ROUTING (except for ABS models)
2-60
1. Stator coil lead
2. Neutral switch lead
3. Oil level switch lead
4. Wire harness
5. Tail sub-wire harness
6. Headlight relay
7. Starter relay
8. Fuse box
9. Main fuse lead
10. Positive battery lead
11. Sidestand switch coupler
12. Crankshaft position sensor lead
13. Turn signal/hazard relay
14. Relay unit
15. Lean angle sensor lead
16. Starter motor lead
17. Main fuse
18.
Yamaha
diagnostic tool coupler
19. Speed sensor lead
20. Ground lead
A. After connecting the couplers, cover the couplers
with the coupler cover, and then place the couplers
in the air duct.
B. Insert the projections on the wire harness holders
into the holes in the frame.
C. Do not face the catch of the holder downward.
D. Insert the projection on the tail sub-wire harness
holder into the hole in the battery box.
E. Insert the projection on the wire harness holder
into the hole in the battery box.
F. Route the main fuse lead under the fuse box.
G. Route the positive battery lead under the fuse box.
H. To the starter motor
I.
Route the oil level switch lead to the inside of the
frame.
J. Route the sidestand switch lead to the inside of the
frame.
K. After connecting the sidestand switch coupler,
insert the projection on the coupler cover into the
hole in the frame.
L. Fasten the oil level switch lead and sidestand
switch lead with the holder. Position the holder
between the sidestand switch coupler and the
sidestand switch lead holder.
M. Install the sidestand switch lead holder at the
location shown.
N. Fasten the oil level switch lead to the frame with a
plastic locking tie.
O. Point the end of the plastic locking tie downward.
P. Insert the projection on the wire harness holder
into the hole in the battery box.
Q. Insert the projection on the positive battery lead
holder into the hole in the battery box.
R. After connecting the positive battery lead and
starter motor lead, install the starter relay cover.
S. Insert the projection on the ground lead holder into
the hole in the battery box.
T. Point the end of the plastic locking tie inward.
U. Position the buckle of the plastic locking tie on top
of the frame, with the end pointing outward, and
then cut off the excess end of the tie to 1
–
5 mm
(0.04
–
0.20 in).
V. Install the ground lead terminal so that the crimped
section of the terminal that secures the lead is
facing inward. Install the ground lead terminal and
the drive pulley housing using the same bolt.
W. Side of the drive pulley housing
X. Install the ground lead terminal so that the
indicated section of the terminal is positioned to
the front of the side of the drive pulley housing.
Summary of Contents for XVS950CU 2014
Page 1: ...2014 SERVICE MANUAL XVS950CU XVS950CUE 1XC 28197 E0...
Page 6: ......
Page 8: ......
Page 73: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 30...
Page 76: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 33 EAS20410 LUBRICATION DIAGRAMS...
Page 78: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 35...
Page 79: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 36 1 Camshaft 2 Crankshaft...
Page 80: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 37...
Page 81: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 38 1 Oil drain bolt 2 Crankshaft...
Page 82: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39...
Page 100: ...CABLE ROUTING except for ABS models 2 57 Spark plug lead B A 2 2 1 1 C F 3 4 5 6 7 8 10 D E 9...
Page 112: ...CABLE ROUTING except for ABS models 2 69 Fuel tank breather hose right side view 1 2 3 A B...
Page 114: ...CABLE ROUTING except for ABS models 2 71 Intake air pressure sensor hose top view 1 B C 2 A...
Page 132: ...CABLE ROUTING for ABS models 2 89 Front brake hose front and right side view 1 A B 1 1 1 2 C D...
Page 138: ...CABLE ROUTING for ABS models 2 95 Spark plug lead 3 3 4 4 5 6 7 8 9 10 11 12 C D A B 1 1 2 2...
Page 150: ...CABLE ROUTING for ABS models 2 107 Fuel tank breather hose right side view 1 2 3 A B...
Page 152: ...CABLE ROUTING for ABS models 2 109 Intake air pressure sensor hose top view 1 B C 2 A...
Page 156: ...CABLE ROUTING for ABS models 2 113...
Page 159: ......
Page 288: ...BELT DRIVE 4 97...
Page 293: ...ENGINE INSPECTION 5 2 10 Install Rear cylinder right cover Refer to ENGINE REMOVAL on page 5 3...
Page 399: ...IGNITION SYSTEM 7 8...
Page 407: ...ELECTRIC STARTING SYSTEM 7 16...
Page 413: ...CHARGING SYSTEM 7 22...
Page 429: ...SIGNALING SYSTEM 7 38...
Page 481: ...FUEL INJECTION SYSTEM 7 90...
Page 487: ...FUEL PUMP SYSTEM 7 96...
Page 499: ...IMMOBILIZER SYSTEM 7 108...
Page 537: ...ABS ANTI LOCK BRAKE SYSTEM for ABS models 7 146...
Page 540: ...ELECTRICAL COMPONENTS 7 149 1 2 5 7 10 8 9 6 16 15 14 13 4 3 11 12...
Page 574: ......
Page 575: ......
Page 576: ......