2 - 28
SPEC
CABLE ROUTING DIAGRAM
1
Throttle cable
2
Brake hose
3
Clamp
4
Light switch lead
5
Hot starter cable
6
Clutch cable
7
Hose guide
8
Clutch switch lead
9
Engine stop switch lead
0
Trip meter cable
A
Main switch lead
B
Trip meter
C
Main switch
D
Light switch
E
Start switch lead
È
Fasten the start switch lead
and light switch lead.
É
Fasten the engine stop switch
lead and clutch switch lead.
Ê
Pass the brake hose through
the hose guide.
Ë
Pass the start switch lead in
front of the main switch lead.
Ì
Fasten the start switch lead.
Í
Pass the hot starter cable,
clutch cable and light switch
lead between the upper
bracket and coupler bracket.
Î
Pass the throttle cables
between the upper bracket and
trip meter.
www.PlanDeGraissage.org