ELECTRICAL COMPONENTS
9-107
b. Measure the throttle position sensor maxi-
mum resistance.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
3. Install:
• Throttle position sensor
TIP
When installing the throttle position sensor, ad-
just its angle properly. Refer to “ADJUSTING
THE THROTTLE POSITION SENSOR” on page
7-13.
EBS30314
CHECKING THE INTAKE AIR PRESSURE
SENSOR
WARNING
EWB03210
• Handle the intake air pressure sensor with
special care.
• Never subject the intake air pressure sen-
sor to strong shocks. If the intake air pres-
sure sensor is dropped, replace it.
1. Check:
• Intake air pressure sensor output voltage
Out of specification
→
Replace.
▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼▼▼
a. Connect the test harness S– pressure sensor
5S7 (3P) “1” between the intake air pressure
sensor and wire harness as shown.
b. Connect the digital circuit tester to the test
harness S– pressure sensor 5S7 (3P).
c. Turn the main switch to “
” (on).
d. Measure the intake air pressure sensor out-
put voltage.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
EBS30315
CHECKING THE INTAKE AIR
TEMPERATURE SENSOR
1. Remove:
• Intake air temperature sensor
(from the air filter case.)
WARNING
EWB02940
• Handle the intake air temperature sensor
with special care.
• Never subject the intake air temperature
sensor to strong shocks. If the intake air
temperature sensor is dropped, replace it.
2. Check:
• Intake air temperature sensor resistance
Out of specification
→
Replace.
Intake air pressure sensor output
voltage
3.594–3.684 V at 101 kPa (1.01
kgf/cm², 14 psi)
Test harness S– pressure sensor
5S7 (3P)
90890-03211
Test harness S– pressure sensor
5S7 (3P)
YU-03211
Digital circuit tester
90890-03174
Model 88 Multimeter with ta-
chometer
YU-A1927
• Positive tester probe
→
pink (wire harness color)
• Negative tester probe
→
black/blue (wire harness color)
Intake air temperature sensor re-
sistance
5.40–6.60 k
Ω
at 0 °C (32 °F)
290–390
Ω
at 80 °C (176 °F)
1
Summary of Contents for Wolverine YX70EPNG
Page 1: ...2016 17 SERVICE MANUAL YX70EPNG YXE70WPXG YXE70WPHG YXE70WDXG YXE700E YXE700SE 2MB G8198 E0 ...
Page 6: ......
Page 8: ......
Page 11: ...IDENTIFICATION 1 2 ...
Page 32: ...SPECIAL TOOLS 1 23 ...
Page 60: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27 EBS30023 LUBRICATION DIAGRAMS 6 1 2 3 4 5 7 8 9 3 ...
Page 62: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29 1 2 3 4 5 ...
Page 64: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31 3 6 1 2 7 8 4 5 ...
Page 66: ...COOLING SYSTEM DIAGRAMS 2 33 EBS20021 COOLING SYSTEM DIAGRAMS 6 1 2 2 6 1 3 4 4 5 5 ...
Page 68: ...COOLING SYSTEM DIAGRAMS 2 35 4 3 3 4 1 2 ...
Page 70: ...COOLING SYSTEM DIAGRAMS 2 37 2 1 4 3 5 6 ...
Page 74: ...CABLE ROUTING 2 41 Frame center left view A B 1 2 3 3 4 5 6 7 8 9 10 ...
Page 78: ...CABLE ROUTING 2 45 Frame center right view 1 2 3 4 5 6 7 8 9 A B B C A D E ...
Page 84: ...CABLE ROUTING 2 51 Frame center top view 1 FWD A B C 1 2 3 4 5 6 7 8 9 10 11 ...
Page 86: ...CABLE ROUTING 2 53 Frame center top view 2 FWD 1 2 2 3 3 4 4 3 4 5 6 A B C D D D E F G 7 ...
Page 88: ...CABLE ROUTING 2 55 Fuel tank top view FWD A A B C D D D 1 1 2 2 1 3 3 4 3 4 ...
Page 90: ...CABLE ROUTING 2 57 Front brake caliper left view A 1 2 3 3 3 B B ...
Page 92: ...CABLE ROUTING 2 59 Rear brake caliper left view A B B C C C 1 2 A A C D 1 2 2 2 ...
Page 94: ...CABLE ROUTING 2 61 Front brake caliper top view A B B C D 1 2 3 3 ...
Page 96: ...CABLE ROUTING 2 63 Brake pipe top and left view FWD FWD A A A 1 1 1 ...
Page 97: ...CABLE ROUTING 2 64 1 Rear brake pipe A Fasten the rear brake pipe with the holder ...
Page 98: ...CABLE ROUTING 2 65 Rear brake caliper top view A A B B B C C C 1 2 2 ...
Page 100: ...CABLE ROUTING 2 67 Parking brake left view A B 1 1 1 1 ...
Page 104: ...CABLE ROUTING 2 71 ...
Page 140: ...PERIODIC MAINTENANCE 3 35 ...
Page 148: ...GENERAL CHASSIS 2 4 5 1 b a a ...
Page 210: ...REAR ARMS AND REAR SHOCK ABSORBER ASSEMBLIES 4 67 ...
Page 215: ...ENGINE INSPECTION 5 2 10 Install Frame cross member Refer to GENERAL CHASSIS 9 on page 4 19 ...
Page 262: ...SHIFT LEVER 5 49 T R Drive select lever shift rod lock nut 15 Nm 1 5 m kgf 11 ft lbf ...
Page 308: ...MIDDLE GEAR 5 95 ...
Page 319: ...THERMOSTAT 6 10 Refer to CHECKING THE RADIATOR on page 6 6 ...
Page 375: ......
Page 385: ...ELECTRIC STARTING SYSTEM 9 10 ...
Page 389: ...CHARGING SYSTEM 9 14 ...
Page 403: ...SIGNALING SYSTEM 9 28 ...
Page 443: ...FUEL PUMP SYSTEM 9 68 ...
Page 460: ...ELECTRICAL COMPONENTS 9 85 3 4 10 12 2 1 9 8 7 5 6 13 14 11 ...
Page 462: ...ELECTRICAL COMPONENTS 9 87 6 1 4 5 3 2 11 8 19 18 17 16 15 14 10 9 7 8 13 12 12 ...
Page 486: ...ELECTRICAL COMPONENTS 9 111 ...