FRONT AND REAR BRAKES
4-38
4. Fill:
• Brake master cylinder reservoir
(with the specified amount of the specified
brake fluid)
WARNING
EWB02880
• Use only the designated brake fluid. Other
brake fluids may cause the rubber seals to
deteriorate, causing leakage and poor
brake performance.
• Refill with the same type of brake fluid that
is already in the system. Mixing brake fluids
may result in a harmful chemical reaction,
leading to poor brake performance.
• When refilling, be careful that water does
not enter the brake master cylinder reser-
voir. Water will significantly lower the boil-
ing point of the brake fluid and could cause
vapor lock.
NOTICE
ECB01320
Brake fluid may damage painted surfaces
and plastic parts. Therefore, always clean up
any spilt brake fluid immediately.
5. Bleed:
• Brake system
Refer to “BLEEDING THE HYDRAULIC
BRAKE SYSTEM” on page 3-19.
6. Check:
• Brake fluid level
Below the minimum level mark
→
Add the
specified brake fluid to the proper level.
Refer to “CHECKING THE BRAKE FLUID
LEVEL” on page 3-18.
7. Check:
• Brake pedal operation
Soft or spongy feeling
→
Bleed the brake sys-
tem.
Refer to “BLEEDING THE HYDRAULIC
BRAKE SYSTEM” on page 3-19.
EBS30097
CHECKING THE BRAKE MASTER
CYLINDER
1. Check:
• Brake master cylinder
Damage/scratches/wear
→
Replace.
• Brake fluid delivery passages
(brake master cylinder body)
Obstruction
→
Blow out with compressed air.
2. Check:
• Brake master cylinder reservoir
Cracks/damage
→
Replace the brake master
cylinder.
• Brake master cylinder reservoir diaphragm
• Brake master cylinder reservoir diaphragm
holder
Cracks/damage
→
Replace.
3. Check:
• Brake pipes
Cracks/damage
→
Replace.
EBS30098
CHECKING THE BRAKE PIPES
The following procedure applies to both of the
brake pipes.
1. Check:
• Brake pipe end (flare nut)
Damage
→
Replace the brake master cylin-
der, brake pipes, and related parts as a set.
EBS30099
INSTALLING THE BRAKE MASTER
CYLINDER
1. Install:
• Brake master cylinder
• Brake pipes
WARNING
EWB03160
Proper brake pipe routing is essential to in-
sure safe vehicle operation.
2. Fill:
• Brake master cylinder reservoir
(with the specified amount of the specified
brake fluid)
Specified brake fluid
DOT 4
T
R
.
.
Brake master cylinder bolt
16 Nm (1.6 m·kgf, 12 ft·lbf)
Brake pipe flare nut
19 Nm (1.9 m·kgf, 14 ft·lbf)
Specified brake fluid
DOT 4
Summary of Contents for Wolverine YX70EPNG
Page 1: ...2016 17 SERVICE MANUAL YX70EPNG YXE70WPXG YXE70WPHG YXE70WDXG YXE700E YXE700SE 2MB G8198 E0 ...
Page 6: ......
Page 8: ......
Page 11: ...IDENTIFICATION 1 2 ...
Page 32: ...SPECIAL TOOLS 1 23 ...
Page 60: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27 EBS30023 LUBRICATION DIAGRAMS 6 1 2 3 4 5 7 8 9 3 ...
Page 62: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29 1 2 3 4 5 ...
Page 64: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31 3 6 1 2 7 8 4 5 ...
Page 66: ...COOLING SYSTEM DIAGRAMS 2 33 EBS20021 COOLING SYSTEM DIAGRAMS 6 1 2 2 6 1 3 4 4 5 5 ...
Page 68: ...COOLING SYSTEM DIAGRAMS 2 35 4 3 3 4 1 2 ...
Page 70: ...COOLING SYSTEM DIAGRAMS 2 37 2 1 4 3 5 6 ...
Page 74: ...CABLE ROUTING 2 41 Frame center left view A B 1 2 3 3 4 5 6 7 8 9 10 ...
Page 78: ...CABLE ROUTING 2 45 Frame center right view 1 2 3 4 5 6 7 8 9 A B B C A D E ...
Page 84: ...CABLE ROUTING 2 51 Frame center top view 1 FWD A B C 1 2 3 4 5 6 7 8 9 10 11 ...
Page 86: ...CABLE ROUTING 2 53 Frame center top view 2 FWD 1 2 2 3 3 4 4 3 4 5 6 A B C D D D E F G 7 ...
Page 88: ...CABLE ROUTING 2 55 Fuel tank top view FWD A A B C D D D 1 1 2 2 1 3 3 4 3 4 ...
Page 90: ...CABLE ROUTING 2 57 Front brake caliper left view A 1 2 3 3 3 B B ...
Page 92: ...CABLE ROUTING 2 59 Rear brake caliper left view A B B C C C 1 2 A A C D 1 2 2 2 ...
Page 94: ...CABLE ROUTING 2 61 Front brake caliper top view A B B C D 1 2 3 3 ...
Page 96: ...CABLE ROUTING 2 63 Brake pipe top and left view FWD FWD A A A 1 1 1 ...
Page 97: ...CABLE ROUTING 2 64 1 Rear brake pipe A Fasten the rear brake pipe with the holder ...
Page 98: ...CABLE ROUTING 2 65 Rear brake caliper top view A A B B B C C C 1 2 2 ...
Page 100: ...CABLE ROUTING 2 67 Parking brake left view A B 1 1 1 1 ...
Page 104: ...CABLE ROUTING 2 71 ...
Page 140: ...PERIODIC MAINTENANCE 3 35 ...
Page 148: ...GENERAL CHASSIS 2 4 5 1 b a a ...
Page 210: ...REAR ARMS AND REAR SHOCK ABSORBER ASSEMBLIES 4 67 ...
Page 215: ...ENGINE INSPECTION 5 2 10 Install Frame cross member Refer to GENERAL CHASSIS 9 on page 4 19 ...
Page 262: ...SHIFT LEVER 5 49 T R Drive select lever shift rod lock nut 15 Nm 1 5 m kgf 11 ft lbf ...
Page 308: ...MIDDLE GEAR 5 95 ...
Page 319: ...THERMOSTAT 6 10 Refer to CHECKING THE RADIATOR on page 6 6 ...
Page 375: ......
Page 385: ...ELECTRIC STARTING SYSTEM 9 10 ...
Page 389: ...CHARGING SYSTEM 9 14 ...
Page 403: ...SIGNALING SYSTEM 9 28 ...
Page 443: ...FUEL PUMP SYSTEM 9 68 ...
Page 460: ...ELECTRICAL COMPONENTS 9 85 3 4 10 12 2 1 9 8 7 5 6 13 14 11 ...
Page 462: ...ELECTRICAL COMPONENTS 9 87 6 1 4 5 3 2 11 8 19 18 17 16 15 14 10 9 7 8 13 12 12 ...
Page 486: ...ELECTRICAL COMPONENTS 9 111 ...