FRONT CONSTANT VELOCITY SHAFT ASSEMBLIES, DIFFEREN-
TIAL ASSEMBLY AND FRONT DRIVE SHAFTS
8-12
3. Apply:
• Molybdenum disulfide grease
(into the double offset joint, constant velocity
joint, and dust boots)
TIP
Molybdenum disulfide grease is included in the
repair kit.
4. Install:
• Dust boots “1”
• Boot bands “2”, “3”, “4”, “5”
TIP
The dust boots should be fastened with the boot
bands “3” and “5” at the grooves in the constant
velocity shaft.
▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼▼▼
a. Install the dust boots.
b. Install the boot bands “4” and “5”.
TIP
Use the boot band installation tool “6”.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
5. Check:
• Thrust movement free play
Excessive play
→
Replace the constant ve-
locity shaft assembly.
EBS30243
REMOVING THE FRONT DRIVE SHAFT
YOKE
1. Remove:
• Front drive shaft yoke
TIP
Use the universal joint holder “1” to hold the front
drive shaft yoke, then loosen the front drive shaft
yoke nut.
B. Differential side
Molybdenum disulfide grease
60–80 g (2.1–2.8 oz) per dust
boot (wheel side)
35–55 g (1.2–1.9 oz) per dust
boot (differential side)
1
2
B
New
4
3
B
New
New
Boots band installation tool
90890-01526
Boots band installation tool
YM-01526
Universal joint holder
90890-04062
Universal joint holder
YM-04062
4
6
Summary of Contents for Wolverine YX70EPNG
Page 1: ...2016 17 SERVICE MANUAL YX70EPNG YXE70WPXG YXE70WPHG YXE70WDXG YXE700E YXE700SE 2MB G8198 E0 ...
Page 6: ......
Page 8: ......
Page 11: ...IDENTIFICATION 1 2 ...
Page 32: ...SPECIAL TOOLS 1 23 ...
Page 60: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27 EBS30023 LUBRICATION DIAGRAMS 6 1 2 3 4 5 7 8 9 3 ...
Page 62: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29 1 2 3 4 5 ...
Page 64: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31 3 6 1 2 7 8 4 5 ...
Page 66: ...COOLING SYSTEM DIAGRAMS 2 33 EBS20021 COOLING SYSTEM DIAGRAMS 6 1 2 2 6 1 3 4 4 5 5 ...
Page 68: ...COOLING SYSTEM DIAGRAMS 2 35 4 3 3 4 1 2 ...
Page 70: ...COOLING SYSTEM DIAGRAMS 2 37 2 1 4 3 5 6 ...
Page 74: ...CABLE ROUTING 2 41 Frame center left view A B 1 2 3 3 4 5 6 7 8 9 10 ...
Page 78: ...CABLE ROUTING 2 45 Frame center right view 1 2 3 4 5 6 7 8 9 A B B C A D E ...
Page 84: ...CABLE ROUTING 2 51 Frame center top view 1 FWD A B C 1 2 3 4 5 6 7 8 9 10 11 ...
Page 86: ...CABLE ROUTING 2 53 Frame center top view 2 FWD 1 2 2 3 3 4 4 3 4 5 6 A B C D D D E F G 7 ...
Page 88: ...CABLE ROUTING 2 55 Fuel tank top view FWD A A B C D D D 1 1 2 2 1 3 3 4 3 4 ...
Page 90: ...CABLE ROUTING 2 57 Front brake caliper left view A 1 2 3 3 3 B B ...
Page 92: ...CABLE ROUTING 2 59 Rear brake caliper left view A B B C C C 1 2 A A C D 1 2 2 2 ...
Page 94: ...CABLE ROUTING 2 61 Front brake caliper top view A B B C D 1 2 3 3 ...
Page 96: ...CABLE ROUTING 2 63 Brake pipe top and left view FWD FWD A A A 1 1 1 ...
Page 97: ...CABLE ROUTING 2 64 1 Rear brake pipe A Fasten the rear brake pipe with the holder ...
Page 98: ...CABLE ROUTING 2 65 Rear brake caliper top view A A B B B C C C 1 2 2 ...
Page 100: ...CABLE ROUTING 2 67 Parking brake left view A B 1 1 1 1 ...
Page 104: ...CABLE ROUTING 2 71 ...
Page 140: ...PERIODIC MAINTENANCE 3 35 ...
Page 148: ...GENERAL CHASSIS 2 4 5 1 b a a ...
Page 210: ...REAR ARMS AND REAR SHOCK ABSORBER ASSEMBLIES 4 67 ...
Page 215: ...ENGINE INSPECTION 5 2 10 Install Frame cross member Refer to GENERAL CHASSIS 9 on page 4 19 ...
Page 262: ...SHIFT LEVER 5 49 T R Drive select lever shift rod lock nut 15 Nm 1 5 m kgf 11 ft lbf ...
Page 308: ...MIDDLE GEAR 5 95 ...
Page 319: ...THERMOSTAT 6 10 Refer to CHECKING THE RADIATOR on page 6 6 ...
Page 375: ......
Page 385: ...ELECTRIC STARTING SYSTEM 9 10 ...
Page 389: ...CHARGING SYSTEM 9 14 ...
Page 403: ...SIGNALING SYSTEM 9 28 ...
Page 443: ...FUEL PUMP SYSTEM 9 68 ...
Page 460: ...ELECTRICAL COMPONENTS 9 85 3 4 10 12 2 1 9 8 7 5 6 13 14 11 ...
Page 462: ...ELECTRICAL COMPONENTS 9 87 6 1 4 5 3 2 11 8 19 18 17 16 15 14 10 9 7 8 13 12 12 ...
Page 486: ...ELECTRICAL COMPONENTS 9 111 ...