FRONT ARMS AND FRONT SHOCK ABSORBER ASSEMBLIES
4-57
EBS30113
CHECKING THE FRONT ARMS
The following procedure applies to both of the
front upper arms and front lower arms.
1. Check:
• Front arm free play
▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼▼▼
a. Check the front arm side play “A” by moving
it from side to side.
If side play is noticeable, check the bushings.
b. Check the front arm vertical movement “B” by
moving it up and down.
If the vertical movement is tight or rough, or if
there is binding, check the bushings.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
2. Check:
• Front upper arm
• Front lower arm
Bends/damage
→
Replace.
3. Check:
• Bushings
Wear/damage
→
Replace.
EBS30114
HANDLING THE FRONT SHOCK ABSORBER
ASSEMBLIES
WARNING
EWB03170
Shock absorbers and gas cylinders contain
highly compressed nitrogen gas. Before
handling the front shock absorber or gas cyl-
inder, read and make sure you understand
the following information. The manufacturer
cannot be held responsible for property
damage or personal injury that may result
from improper handling of the front shock
absorber and gas cylinder.
• Do not tamper or attempt to open the front
shock absorber or gas cylinder.
• Do not subject the front shock absorber or
gas cylinder to an open flame or any other
source of high heat. High heat can cause an
explosion due to excessive gas pressure.
• Do not deform or damage the front shock
absorber or gas cylinder in any way. If the
front shock absorber, gas cylinder or both
are damaged, damping performance will
suffer.
EBS30115
DISPOSING OF A FRONT SHOCK
ABSORBER ASSEMBLY
Gas pressure must be released before dispos-
ing of a front shock absorber assembly. To re-
lease the gas pressure, drill a 2–3 mm (0.08–
0.12 in) hole through the front shock absorber as
shown.
WARNING
EWB03180
Wear eye protection to prevent eye damage
from released gas or metal chips.
EBS30116
CHECKING THE FRONT SHOCK ABSORBER
ASSEMBLIES
The following procedure applies to both of the
front shock absorber assemblies.
1. Check:
• Front shock absorber assembly
Gas leaks
→
Replace the front shock absorb-
er assembly.
• Front shock absorber rod
Bends/damage
→
Replace the front shock
absorber assembly.
• Spring
Move the spring up and down.
Fatigue
→
Replace the front shock absorber
assembly.
A
A
B
B
Summary of Contents for Wolverine YX70EPNG
Page 1: ...2016 17 SERVICE MANUAL YX70EPNG YXE70WPXG YXE70WPHG YXE70WDXG YXE700E YXE700SE 2MB G8198 E0 ...
Page 6: ......
Page 8: ......
Page 11: ...IDENTIFICATION 1 2 ...
Page 32: ...SPECIAL TOOLS 1 23 ...
Page 60: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27 EBS30023 LUBRICATION DIAGRAMS 6 1 2 3 4 5 7 8 9 3 ...
Page 62: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29 1 2 3 4 5 ...
Page 64: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31 3 6 1 2 7 8 4 5 ...
Page 66: ...COOLING SYSTEM DIAGRAMS 2 33 EBS20021 COOLING SYSTEM DIAGRAMS 6 1 2 2 6 1 3 4 4 5 5 ...
Page 68: ...COOLING SYSTEM DIAGRAMS 2 35 4 3 3 4 1 2 ...
Page 70: ...COOLING SYSTEM DIAGRAMS 2 37 2 1 4 3 5 6 ...
Page 74: ...CABLE ROUTING 2 41 Frame center left view A B 1 2 3 3 4 5 6 7 8 9 10 ...
Page 78: ...CABLE ROUTING 2 45 Frame center right view 1 2 3 4 5 6 7 8 9 A B B C A D E ...
Page 84: ...CABLE ROUTING 2 51 Frame center top view 1 FWD A B C 1 2 3 4 5 6 7 8 9 10 11 ...
Page 86: ...CABLE ROUTING 2 53 Frame center top view 2 FWD 1 2 2 3 3 4 4 3 4 5 6 A B C D D D E F G 7 ...
Page 88: ...CABLE ROUTING 2 55 Fuel tank top view FWD A A B C D D D 1 1 2 2 1 3 3 4 3 4 ...
Page 90: ...CABLE ROUTING 2 57 Front brake caliper left view A 1 2 3 3 3 B B ...
Page 92: ...CABLE ROUTING 2 59 Rear brake caliper left view A B B C C C 1 2 A A C D 1 2 2 2 ...
Page 94: ...CABLE ROUTING 2 61 Front brake caliper top view A B B C D 1 2 3 3 ...
Page 96: ...CABLE ROUTING 2 63 Brake pipe top and left view FWD FWD A A A 1 1 1 ...
Page 97: ...CABLE ROUTING 2 64 1 Rear brake pipe A Fasten the rear brake pipe with the holder ...
Page 98: ...CABLE ROUTING 2 65 Rear brake caliper top view A A B B B C C C 1 2 2 ...
Page 100: ...CABLE ROUTING 2 67 Parking brake left view A B 1 1 1 1 ...
Page 104: ...CABLE ROUTING 2 71 ...
Page 140: ...PERIODIC MAINTENANCE 3 35 ...
Page 148: ...GENERAL CHASSIS 2 4 5 1 b a a ...
Page 210: ...REAR ARMS AND REAR SHOCK ABSORBER ASSEMBLIES 4 67 ...
Page 215: ...ENGINE INSPECTION 5 2 10 Install Frame cross member Refer to GENERAL CHASSIS 9 on page 4 19 ...
Page 262: ...SHIFT LEVER 5 49 T R Drive select lever shift rod lock nut 15 Nm 1 5 m kgf 11 ft lbf ...
Page 308: ...MIDDLE GEAR 5 95 ...
Page 319: ...THERMOSTAT 6 10 Refer to CHECKING THE RADIATOR on page 6 6 ...
Page 375: ......
Page 385: ...ELECTRIC STARTING SYSTEM 9 10 ...
Page 389: ...CHARGING SYSTEM 9 14 ...
Page 403: ...SIGNALING SYSTEM 9 28 ...
Page 443: ...FUEL PUMP SYSTEM 9 68 ...
Page 460: ...ELECTRICAL COMPONENTS 9 85 3 4 10 12 2 1 9 8 7 5 6 13 14 11 ...
Page 462: ...ELECTRICAL COMPONENTS 9 87 6 1 4 5 3 2 11 8 19 18 17 16 15 14 10 9 7 8 13 12 12 ...
Page 486: ...ELECTRICAL COMPONENTS 9 111 ...