6 - 16
–
+
ELEC
CHARGING SYSTEM (TT-R90E)
EC624000
COUPLERS AND LEADS CONNECTION
INSPECTION
1. Check:
●
Couplers and leads connection
Rust/dust/looseness/short-circuit
→
Repair or replace.
CHARGING VOLTAGE INSPECTION
1. Start the engine.
2. Inspect:
●
Charging voltage
Out of specification
→
If no failure is
found in checking the source coil resis-
tance, replace the rectifier/regulator.
Tester (+) lead
→
Red lead
1
Tester (–) lead
→
Black lead
2
Charging
voltage
Tester selector
position
14.0 ~ 15.0 V at
5,000 r/min
DCV-20
W B
R Y
/
R
1
2
3. Inspect:
●
Lighting coil resistance
Out of specification
→
Replace.
Tester (+) lead
→
White lead
1
Tester (–) lead
→
Black lead
2
Lighting coil
resistance
Tester selector
position
0.64 ~ 0.96
Ω
at
20 ˚C (68 ˚F)
Ω
×
1
W Sb
Y B
1
2
Summary of Contents for TT-R90(S)
Page 45: ...GEN INFO MEMO...
Page 57: ...GEN INFO MEMO...
Page 109: ...SPEC MEMO...
Page 319: ...ELEC MEMO...
Page 331: ...ELEC MEMO...
Page 347: ...ELEC MEMO...
Page 353: ...ELEC MEMO...
Page 363: ......