67C3K11
7-48
1
2
3
4
5
6
7
8
9
4.
Check the absorber valves
8
. Clean if
there is dirt or residue.
Assembling the tilt cylinder
CAUTION:
• Do not use a rag when assembling the
PTT unit as dust and particles on the
PTT unit components can lead to poor
performance.
• Do not reuse the dust seal and O-rings,
always replace them with new ones.
NOTE:
Lubricate the parts with ATF Dexron
II
during
assembly.
1.
Install a new dust seal
1
, new O-rings
2
and
3
, and the backup ring
4
into the tilt
cylinder end screw
5
.
2.
Install a new O-ring
6
and the backup
ring
7
to the tilt piston
8
.
3.
Install the tilt cylinder end screw
5
and
tilt piston
8
to the tilt ram
9
.
S67C7092
6
1
2
3
5
4
7
S67C7093
8
S67C7094
5
1
4
2
3
A
5
1
4
3
2
S67C7095
9
5
8
6
7
Summary of Contents for F30A
Page 1: ...F30A F40B SERVICE MANUAL 67C 28197 3K 11 ...
Page 4: ......
Page 26: ...GEN INFO General information 1 21 67C3K11 MEMO ...
Page 150: ...POWR Power unit 5 55 67C3K11 MEMO ...
Page 236: ...BRKT Bracket unit 7 55 67C3K11 MEMO ...
Page 282: ......
Page 283: ...YAMAHA MOTOR CO LTD Printed in China Aug 2007 1 2 1 CR E ...