BRKT
Bracket unit
7-7
67C3K11
4.
Install the throttle friction adjuster
7
, and
then install a new cotter pin
8
.
5.
Install the bushing
9
, throttle grip
0
,
and PTT switch
A
(PTT model).
NOTE:
Fasten the PTT switch lead
B
with the hold-
ers
e
. (PTT model)
6.
Install the throttle cable holder
C
and
shift cable holder
D
as shown.
7.
Install the tiller handle assembly to the
steering arm, and then tighten the nuts to
the specified torque.
8.
Connect the throttle cable and shift
cable.
NOTE:
To adjust the throttle cable and shift cable,
see “Adjusting the throttle cable” (3-8) and
“Checking the gear shift operation” (3-9).
9.
Connect the engine shut-off switch leads
(M model), or 10-pin main harness and
warning indicator assembly coupler (E
and W model).
S67C7006
8
7
S67C7007
LT
242
A
0
9
S67C7113
e
B
T
R
.
.
Tiller handle nut:
37 N·m (3.7 kgf·m, 27.3 ft·lb)
S67C7114
D
C
Summary of Contents for F30A
Page 1: ...F30A F40B SERVICE MANUAL 67C 28197 3K 11 ...
Page 4: ......
Page 26: ...GEN INFO General information 1 21 67C3K11 MEMO ...
Page 150: ...POWR Power unit 5 55 67C3K11 MEMO ...
Page 236: ...BRKT Bracket unit 7 55 67C3K11 MEMO ...
Page 282: ......
Page 283: ...YAMAHA MOTOR CO LTD Printed in China Aug 2007 1 2 1 CR E ...