
XO FLOW – Installation instructions
25
5.4
Fitting the bridge arm and instrument bridge
If the unit has been stocked/transported at a temperature of less than 10
o
C for more than
one hour, it needs to acquire room temperature before being connected to the mains
supply.
1.
Fit the bridge arm carefully by lowering it onto the bridge arm post; be careful not to tilt the arm
and squeeze the bearings – see Figure 27.
2.
Route the tubing and cables inside the outer cylinder as shown in Figure 28.
3.
Route the tubing to the water/air side of the unit stand and conduct the cables to the electronics
section.
4.
Fasten cables and tubing with cable ties to the cable holders.
5.
Check that cables and tubing move freely while the rear bridge arm rotates in its full range.
Figure 27 – Fitting the instrument bridge