Unpacking and Installation, TWTA Octagon CPU
MNC-0300-003
8 of 22
Revision N
5. Tighten all mounting screws with the appropriate size Allen wrench.
6. Use a sequential tightening procedure. Refer to Table 1. Proceed as
follows:
•
Partially tighten one of the screws (#1).
•
Move the tool to the screw that is diagonally opposite to the screw
tightened in step 1 (#2) and partially tighten that screw.
•
Move clockwise to the next screw to be tightened (#3) and partially
tighten that screw.
•
Move to the screw diagonally opposite screw #3 and partially
tighten that screw (#4).
•
If required, repeat this process for the remaining screws (#5-#6, #7-
#8).
•
When you reach the first screw tightened in this step (#1) increase
the torque on the screw and repeat the process until the screws
have all been tightened to the correct torque.
Figure 1, Typical 4 Screw Mounting Flange Tightening Sequence
Figure 2, Typical 8 Screw Mounting Flange Tightening Sequence
Summary of Contents for XTU-400K
Page 10: ...MNC 0000 010 2 of 10 Revision A7...
Page 38: ...Safety Sicherheit MNC 0200 001 14 of 14 Revision E...
Page 60: ...Unpacking and Installation TWTA Octagon CPU MNC 0300 003 22 of 22 Revision N...
Page 66: ...MNC 0400 001 6 of 54 Revision G Operation Rack and Digital HPAs...
Page 90: ...MNC 0400 001 30 of 54 Revision G Operation Rack and Digital HPAs Figure 11 Setup Menu 2...
Page 97: ...MNC 0400 001 37 of 54 Revision G Operation Rack and Digital HPAs...
Page 101: ...MNC 0400 001 41 of 54 Revision G Operation Rack and Digital HPAs...
Page 114: ...MNC 0400 001 54 of 54 Revision G Operation Rack and Digital HPAs...
Page 150: ...MNC 0500 002 36 of 36 Revision H Amplifier Communication and Protocol Octagon ISA CPU...
Page 162: ...MNC 0700 001 6 Revision F Service and Repair...
Page 173: ......
Page 174: ......
Page 175: ......
Page 176: ......
Page 177: ......
Page 178: ......
Page 179: ......
Page 180: ......
Page 181: ......