MNC-0600-003
3 of 6
Revision D
Preventive Maintenance
Preventive Maintenance
Requirements
Monthly
Inspect the Air Inlet and Exhaust Ports. Ensure the ports are
unobstructed. Remove any:
•
Lint
•
Leaves
•
Straw
Quarterly
Inspect and clean:
•
the cooling fins.
•
the electrical connections; make sure all connections are clean and
tight.
•
the Lower Deck Cover.
Spare Amplifiers
To ensure the working integrity of spare amplifiers, within the
first 6 months following delivery, Xicom Technology
recommends:
•
that spare amplifiers be fitted with an output waveguide load.
•
AC power turned ON.
•
After FTD the High Voltage should be turned ON.
If any problems are encountered they should be reported to
Xicom Technology Customer Service. Contact information is
located in the chapter titled
Overview
.
Summary of Contents for XTU-400K
Page 10: ...MNC 0000 010 2 of 10 Revision A7...
Page 38: ...Safety Sicherheit MNC 0200 001 14 of 14 Revision E...
Page 60: ...Unpacking and Installation TWTA Octagon CPU MNC 0300 003 22 of 22 Revision N...
Page 66: ...MNC 0400 001 6 of 54 Revision G Operation Rack and Digital HPAs...
Page 90: ...MNC 0400 001 30 of 54 Revision G Operation Rack and Digital HPAs Figure 11 Setup Menu 2...
Page 97: ...MNC 0400 001 37 of 54 Revision G Operation Rack and Digital HPAs...
Page 101: ...MNC 0400 001 41 of 54 Revision G Operation Rack and Digital HPAs...
Page 114: ...MNC 0400 001 54 of 54 Revision G Operation Rack and Digital HPAs...
Page 150: ...MNC 0500 002 36 of 36 Revision H Amplifier Communication and Protocol Octagon ISA CPU...
Page 162: ...MNC 0700 001 6 Revision F Service and Repair...
Page 173: ......
Page 174: ......
Page 175: ......
Page 176: ......
Page 177: ......
Page 178: ......
Page 179: ......
Page 180: ......
Page 181: ......