Original Operating Instructions
BATx0100-ES-1-400-1
Installation
O_BATx0100-ES-1-400-1_V3.1_GB
Page
32
of
73
3.5.1.1 Grounding
Required material:
•
1 x M8x20 mm hexagon screw
•
1 x
8.4 mm conical spring washer
Procedure:
1.
Connect
the PE conductor to the press-in nut (Figure 12).
2.
Tighten
the screw with a torque of
22 Nm
.
NOTICE: The cable lug must be suitable for a M8 screw.
3.
Fix
the cable with a cable clamp.
Summary of Contents for BAT 0100-ES-1-400-1 Series
Page 73: ......