5.4
Starting the Product
Procedure:
1.
Switch
the AC circuit breaker in position
ON
. The DC circuit breaker is
operated automatically.
NOTICE: Operation is started after the appropriate checks via the user interface.
5.5
Carry Out Measurements
DANGER!
Danger to life due to electric shock if the product is not locked!
After stopping the product dangerous voltages is present.
•
Perform measurements only with closed door.
NOTICE
Damage to measuring device due to overvoltage!
Performing measurements with the incorrect measuring range can
cause damages to the measuring device.
•
Use only measuring devices with the correct measuring range.
5.5.1 AC Voltage
Requirements for measuring the AC voltage externally:
•
The motor protecting switch (-F31) (Figure 5) must be in position
I
.
Procedure:
1.
Ensure
that the measuring device is connected according to Section 3.5.2.5.
2.
Start
the product (Section 5.4).
3.
Check
if the measured values are within the specified limits (Table 10).