Original Operating Instructions
BATx0100-ES-1-400-1
Installation
O_BATx0100-ES-1-400-1_V3.1_GB
Page
41
of
73
3.5.2 Optional Connections
The following cables and lines must be in flawless condition, safe and de-energized:
•
Feedback Operating Status (Section 3.5.2.1)
•
Feedback Enable Switch (Section 3.5.2.2)
•
Feedback Insulation Monitoring Device (Section 3.5.2.3)
•
External Disconnecting Device (Section 3.5.2.4)
•
External Voltage Measurement Device (Section 3.5.2.5)
•
External Current Measurement Device (Section 3.5.2.6)
•
External Temperature Sensor (Section 3.5.2.7)
Summary of Contents for BAT 0100-ES-1-400-1 Series
Page 73: ......