![Worldwide Construction And Forestry Division 380GLC Operator'S Manual Download Page 246](http://html1.mh-extra.com/html/worldwide-construction-and-forestry-division/380glc/380glc_operators-manual_998038246.webp)
Miscellaneous—Operational Checkout
Continued on next page
CN93077,000003A -19-16MAY13-49/53
Cycle Times Check
CAUTION: Prevent possible injury from unexpected machine movement.
Clear all persons from the area before operating machine.
NOTE: Warm hydraulic oil to operating temperature for this check.
ACC
O
N
S
T
A
R
T
5
9
3
8
5
4
0
2
7
1
6
OFF
2
MODE
1
A/I
ON
A/I
OFF
OFF
OFF
INT
ON
PUSH
H
L
PUSH
TUNE/AM-FM
PUSH
MODE
PUSH
MENU/SET
min
-1
L
H
PUSH
VOL/PWR
PUSH
/VOL
/PWR
1
5
2
3
4
TX1136301 —UN—10MAY13
Switch Panel
1— Engine Speed Dial
2— Auto-Idle Switch
3— Travel Speed Switch
4— Power Mode Switch
5— Monitor Dial
Turn engine speed dial (1) to H (fast idle) position.
Turn auto-idle switch (2) to A/I OFF position.
Press power mode button (4) until PWR (power) mode is displayed on monitor.
Rotate monitor dial (5) to highlight and select Dig mode from Work Mode menu.
TX1095475 —UN—11AUG11
Boom
TX1095499 —UN—28JUN13
Arm, Bucket, Swing
Move machine to position shown for each test.
Record cycle time for each function.
4-2-41
092221
PN=246
Summary of Contents for 380GLC
Page 6: ...Introduction Continued on next page TX JDEULA 19 11JUL16 2 3 TX1219046 UN 11JUL16 092221 PN 6...
Page 7: ...Introduction TX JDEULA 19 11JUL16 3 3 TX1219047 UN 14JUL16 092221 PN 7...
Page 9: ...Introduction DX EMISSIONS EPA 19 12DEC12 2 2 TS1721 UN 15JUL13 092221 PN 9...
Page 17: ...Introduction DX EMISSIONS CARB 19 26AUG20 8 8 RG32759 UN 19AUG20 092221 PN 17...
Page 24: ...Introduction 092221 PN 24...
Page 287: ...Index Index 11 092221 PN 11...
Page 288: ...Index Index 12 092221 PN 12...