INSPECTION
6 720 648 726 (2011/07)
61
12 INSPECTION
B
The activities to be included in an annual inspection
and maintenance contract can be found in the
inspection and service record log book (
Æ
pages 63
12.1 PREPARING THE HEATING SYSTEM
FOR INSPECTION
B
Switch off the power supply to the heating system.
Fig. 100 Switch off the power supply to the heating system
B
Close the gas valve [1].
B
Close the isolating valves[2].
Fig. 101 Closing the valves (here: in closed position)
12.2 OPENING THE BOILER DOOR
B
Turn the vent key through a quarter rotation to undo
the boiler door lock (
Æ
detailed picture).
B
Push the fastener down and open the boiler door.
Fig. 102 Opening the boiler door
12.3 CARRY OUT A VISUAL CHECK FOR
GENERAL SIGNS OF CORROSION
B
Check all gas and water-bearing pipes for signs of
corrosion and for leaks.
WARNING:
Damage to the installation due
to insufficient or improper cleaning and
maintenance.
B
Inspect and clean the heating system
once a year.
B
Carry out maintenance as required.
Immediately remedy faults. This will
avoid further damage to the system!
DANGER:
Danger of fatal accident due to electric
current when the boiler is on.
B
Before opening the boiler:
Switch off the power supply to the boiler
by isolating the supply and removing the
fuse.
B
Secure the heating system so that it
cannot be switched on again
unexpectedly.
ON
OFF
6 720 648 726-080.1TD
DANGER:
Danger of fatal accident from explosive
fumes.
B
Only carry out work on gas pipes and
fittings if you are Gas Safe / ACS
registered.
If the boiler door cannot be swung open
completely, remove it (
Æ
section 13.1
„Removing the boiler door“, page 64).
6 720 648 726-101.1TD
2
2
1
6 720 648 726-038.1TD