DIMENSIONS OF BOILER
6 720 648 726 (2011/07)
18
Fig. 7
Dimensions and connections WITH pump group (dimensions in mm)
1) The pump group is an accessory which has to be ordered separately.
CDO
Condensate drain outlet; Ø 24 mm O/D
CHF
CH (boiler) flow; G1½’’ union nut with female thread
CHR
CH (boiler) return; G1½’’ union nut with female thread
CS
Cap (DO NOT remove)
FGC/AIC
Flue gas/air intake connection: Ø 80/125 for GB162-65 and Ø 100/150 for GB162-80/100
GAS B
Gas connection to boiler; G1’’ female thread
GAS P
Gas connection to pump group; Rp1’’ female thread
PF
Pump group flow; G1½’’ male thread, flat seal
PR
Pump group return; G1½’’ male thread, flat seal
The servicing clearances required are:
•
in front:
50 mm
•
below:
0 mm (250 mm with pump group)
•
right side:
0 mm
•
left side:
0 mm
•
above:
30 mm.
The position selected for installation MUST allow
adequate space for servicing in front of the boiler:
•
in front:
550 mm
•
below:
350 mm
•
right side:
0 mm
•
left side:
0 mm
•
above:
40 mm.
CDO
1280
980
1003
1030
1186
1310
135
103.5
520
300
140
130
130
39
35
138
162
465
6
152
FGC
AIC
FGC
AIC
CHF
CHR
GAS B
PF
PR
GAS A
CDO
CS
PF/PR
550
40
0
0
0
1)
1)
6 720 648 726-007.1TD