COMMISSIONING
6 720 648 726 (2011/07)
59
10.5 COMMISSIONING RECORD LOG BOOK
B
Enter your signature and the date after completing the start-up activities.
Start-up activities
Page
Measurement
results
Remarks
1.
Filling and pressure testing the heating system.
•
Pre-pressure expansion vessel (refer to the
installation instructions for the expansion vessel)
•
Heating system filling pressure
_____________bar
_____________bar
2.
Write down the gas characteristics: Wobbe-index
Operating heat value
_____________kWh/m³
_____________kWh/m³
3.
Checking for gas leaks
4.
Bleeding the gas flow pipe
5.
Checking the flue gas connection
6.
Checking the appliance configuration
7.
Measuring the gas supply pressure (working pressure)
_____________mbar
8.
Checking and adjusting the gas/air ratio
_____________Pa/mbar
9.
Carrying out a leakage check in operating conditions
10.
Measuring the carbon monoxide content (CO), air free
11.
Function testing
Measure the ionisation current
_____________
μ
A
12.
Boiler settings
13.
Closing and locking the boiler door
14.
Informing the user, handing over technical documents
Confirming proper commissioning
Company stamp/signature/date
Table 19