HM126 Operator’s Manual
RAILS & CENTRE BUNK
Assemble the centre bunk over the joint between both pairs of track rails using the components
and hardware listed in the table below.
* Centre bunk incorporates four (4) mounting holes at each end.
First, set the four (4) track rails on top of four pieces of lumber of equal height. It is ideal to keep
the rails at least 4-6 in [100-150 mm] off the ground for ease of assembly..
16x
M10 X 35 mm
Flanged Hex
Bolt
4x
Track Rail
16x
M10 Flanged
Lock Nut
2x
Reinforcement
Plate
1x
Centre Bunk*
HM126-MY2021-EN: Rev F
Page
of
17
112
14-Jul-2021
Build track up off the ground
on large timbers or blocks for
ease of assembly, preferably
4-6 in [100-150 mm] tall