HM126 Operator’s Manual
LOG SUPPORTS
Assemble the log supports to the centre and mid bunks using the components and hardware
listed in the table below.
Assemble six (6) M10 X 25 mm flanged hex bolts and six (6) M10 hex jam nuts (2 each per
bunk) into the threaded holes in the sleeves on the centre bunk and both mid bunks. These
bolts are not used to secure the log supports—they help square the log support to the top face
of the bunk if necessary. See next page for directions.
The log supports can be installed into any of the sleeves on the centre or mid bunks.
6x
M10 X 25 mm
Flanged Hex
Bolt
2x
Bevelled Log
Support
6x
M10 Hex Nut
2x
Key Stop Log
Support
HM126-MY2021-EN: Rev F
Page
of
28
112
14-Jul-2021
Di
rec
tio
n o
f C
ut
Use the shorter key
stop log support for
milling smaller logs
and square cants
Use the longer
bevelled log
support for
milling large
diameter logs
M10 Hex Nut
M10 X 25 mm
Flanged Hex Bolt