HM126 Operator’s Manual
LEVELLING FEET
Assemble the levelling feet using the components and hardware listed in the table below.
Assemble twelve (12) sets of levelling feet, each one with a levelling foot base, an M16 X 120
mm hex bolt, and two (2) M16 hex nuts. A third hex nut will secure the foot assembly to the rail
on the next page.
Fully tighten the bottom nut and position the second nut roughly 3-
½
—4 in [90—100 mm] from
the bottom of the foot base. Ensure the position of the second nut is the same for all twelve (12)
levelling foot assemblies.
12x
M16 X 120 mm
Hex Bolt
12x
Levelling Foot
Base
36x
M16 Hex Nut
HM126-MY2021-EN: Rev F
Page
of
21
112
14-Jul-2021
M16 X 120 mm
Hex Bolt
M16 Hex Nut
3-
½
—4 in
[90—100 mm]
Thread second nut into
the same position for
all 12 foot assemblies
Fully tighten
first nut