HM126 Operator’s Manual
LEVELLING THE SAWMILL HEAD ASSEMBLY
Using a tape measure, measure the distance from the blade to the top of the log bunk on both
the left and right side. The distance should be equal. If the measurements are not equal, adjust
the lift cable ends under the lift mechanism sub-assembly to either raise or lower one side.
Loosen the left-side flange nuts on the lift cable eyebolts first. Turn the right-side flange nuts
clockwise to raise one side of the sawmill head assembly, or counter-clockwise to lower it.
Double-check the blade height as discussed in the previous step.
Once the measurements on both sides are equal and the sawmill head is level, tighten the left-
side flange nuts securely against lift mechanism brackets.
HM126-MY2021-EN: Rev F
Page
of
61
112
14-Jul-2021
Lift Cable A
Lift Cable B
Loosen left-side
flange nut
Loosen left-side
flange nut
B
A
Lift Cable
A
controls the
right
side carriage
height, Lift Cable
B
controls the
left
.
Turn right-side flange nut
clockwise to raise the side of
the sawmill head, counter-
clockwise to lower it.