HM126 Operator’s Manual
LUBRICATION TUBING
Use the tubing listed in the table below to complete the routing for the lubrication
system.
Route the shorter
tank-to-valve
tubing from the blue ring fitting on the tank to the vertical barbed
fitting on the auto-lube valve.
Route the longer
valve-to-guide block
tubing from the horizontal barbed fitting on the auto-lube
valve, down through the bracket on the post sleeve, then to either the barbed fitting (14 hp) or
the copper drip nozzle (9.5 hp) on the guide block holder shaft.
1x
Tubing: Tank-
to-Valve
[Short]
1x
Tubing: Valve-
to-Guide
Block [Long]
HM126-MY2021-EN: Rev F
Page
of
54
112
14-Jul-2021
Route tubing
through bracket
on post sleeve
Connect both tubes
to barbed fittings on
auto-lube valve
Connect tubing to
either barbed fitting
(14 hp) or copper
nozzle (9.5 hp). See
next page for 9.5 hp
drip nozzle assembly
instructions.
Route tube from
valve on tank