
6
Original operation manual
AirlessPhoenixGX_BA_en_1803 • 0550010-en • jw
3.3 Machine design .................................................................. 26
3.4 Optional expansions and accessories ............................... 27
3.4.1 Spraying accessory kits ........................................... 27
3.4.2 Hose holder attachment kit ...................................... 28
3.4.3 AirCombi attachment kit ........................................... 28
4 Transport, installation, and assembly
.................................. 29
4.1 Transport ............................................................................ 29
4.2 Installation site ................................................................... 30
4.3 Assembly ........................................................................... 31
4.3.1 Connecting the spraying hose and spray gun ......... 31
4.3.2 Grounding the machine ........................................... 32
4.3.3 Connecting the compressed air ............................... 32
5 Operation
................................................................................. 33
5.1 Putting the machine into operation
.................................... 33
5.2 Spraying
............................................................................. 34
5.2.1 Setting the spraying pressure
.................................. 34
5.2.2 Tips for good coatings
..............................................
35
5.3 Flushing
............................................................................. 36
5.4 Material change
................................................................. 38
5.5 Relieving the pressure
....................................................... 38
5.6 Work interruption
................................................................ 39
5.7 Decommissioning
............................................................... 39
5.8 Storage
.............................................................................. 40
5.9 Disposal
............................................................................. 40
6 Maintenance
............................................................................ 41
6.1 Regular testing ................................................................... 42
6.2 Maintenance schedule ....................................................... 42
6.3 High pressure pump ........................................................... 43
6.3.1 Checking the release agent for material residues ... 43
6.3.2 Filling the release agent and checking the fill level
.. 43