Wiring Loom 3•10
the clocks. Refer to the wiring diagram
(Fig 7.3).
7.3
5
Connect the dash harness to the
ignition/starter harness. With the 16 pin
plug.
6
Connect the starter harness to the main
chassis harness. Using the 12 pin plug
7
Secure the wires neatly with cable ties
and saddle clamps where required.
8
Secure dash panel to the scuttle by
drilling five 5mm holes through the dash
panel and into the scuttle.
9
Enlarge the holes in the scuttle to 7mm
10
Fit five M5 rivserts into the scuttle.
11
Secure the dash with M5 x 16mm dome
head screws.
8
Fitting -Digital Dash
8.1
1
Locate the digital dash from your parts
along with the dash board.
2
Remove the dust caps from the
connectors on the back of the digital
unit.
3
Position the unit on to the dash board
(Fig 8.1) and secure at the back with
three M4x10mm cap head screws (Fig
8.2).
4
Plug the two round connectors of the
dash harness to the digital dash.
5
Fit the four menu switches in there
holes on the dash board and plug them
into the dash harness.
8.2
6
Fit the ON, OFF and FOG switches to the
dash, and warning lights.
7
Connect the Ignition/start harness to
the ON, OFF and FOG switches.
8
Connect the dash harness to the
ignition/start harness with the 16 pin
plug.
9
Connect the Ignition/start harness to
the main chassis harness with the 12 pin
plug.
10
Offer the dash board up to the scuttle
and temporarily fix in place.
11
Secure dash panel to the scuttle by
drilling five 5mm holes through the dash
panel and into the scuttle.
12
Enlarge the holes in the scuttle to 7mm
13
Fit five M5 rivserts into the scuttle.
14
Secure the dash with M5 x 16mm cap
screws.
9
Fitting -Battery Cables
NOTE:
The battery is mounted in the passenger
footwell and the battery master cut off
switch is mounted on the driver’s side of the
scuttle. Do Not fit the switches now, this is
done in chapter 9.
1
Mount the starter cable from the starter
motor to the master switch possition,
through
the
passenger
bulkhead,
through the scuttle panel and along the
top of the scuttle panel (Fig 9.1).
2
Run the shorter battery cable from the
battery up through the grommet in the
scuttle panel to the master switch (Fig
9.2) and (Fig 9.3)
9.1
9.2
3
Run the earth cable from the battery
negative
through
the
passenger
bulkhead to the earthing position in the
engine bay (Fig 9.4).
9.3
9.4
4
The wires for the master switch need to
be run along the top of the scuttle panel
to the right hand side of the scuttle (Fig
9.5).