14
UM380 03 010
InterChange iQ 2000 and iQ 2000plus
When you have completed the changes to the default parameters and are back to the top
level menu, type:
Select Configuration Option?
EXIT
<
Enter
>
The program exits from the menu, saves the new parameter settings into non-volatile
memory, then activates the operational code.
2.6 Cabling into a Management System
This section explains how to connect the InterChange iQ 2000 and iQ 2000plus into a
Management System via the alarm relay outputs.
2.6.1 Alarm Signal Cabling
Prepare and route an alarm cable to the left hand side of the cabinet (viewed from the rear)
(refer to
Figure 4
). Connect the cable to the 3-way Weidmuller ALARM connector at the rear
of the first InterChange iQ 2000 unit. Lock in place.
Connect the cable to an Alarm Panel or alarm signal detector at the remote end.
2.6.2 Alarm Signal Cable Test
Leave the unit powered on with no ISDN cables connected. This causes an alarm condition
which is notified by the alarm detection equipment.
If no alarm condition is notified then correct the cabling.
2.6.3 Management Terminal Cabling
InterChange iQ 2000 units are normally run with an in-situ management terminal. Where it
is required, route the prepared Management Terminal cable to the left hand side of the unit,
connect to the D-9 outlet labelled Management on the rear of the unit (refer to
Figure 4
), and
lock in place. If the InterChange iQ 2000 or iQ 2000plus is to be managed via the Ethernet,
the user should supply a suitable cable (cat. 5 UTP patch cable) with a RJ45 connector at
the InterChange iQ 2000 unit end for connection to the user Ethernet connection.
Connect the cable to a PC or to a remote PC via a modem or the Ethernet.
2.6.4 Management Terminal Cable Connection Test
Turn on the unit and the remote terminal. Make sure that the terminal communications
parameters are set up correctly, as specified in
Appendix C
. Let the self-tests complete and
the unit enter operation. From the management terminal, enter any management command
and check that the correct response is returned.
If the correct response is not returned then corre§ct the management cable.
Leave the unit switched on for the next test.