6
UM380 03 010
InterChange iQ 2000 and iQ 2000plus
2 Hardware Installation Procedure
This chapter takes the suitably trained and qualified person through the process of:
•
installing an InterChange iQ 2000 or iQ 2000plus unit,
•
initial testing,
•
cabling, and
•
operational checks.
Warning:
Read the Safety Instructions in Appendix A before beginning installation. Installation
should only be carried out by a qualified trained Engineer.
Installation can begin when the site has been correctly prepared.
2.1 Introduction to Unit Installation
To install an InterChange iQ 2000 or iQ 2000plus unit, carry out the following tasks in order:
•
Unpacking and Inspection
•
Hardware Installation
•
Power-On and Self-test
•
Configuration
•
Operational Checks
•
Cabling to the Network
2.2 Unit Installation
2.2.1 Unpacking and Inspection
The InterChange iQ 2000 is supplied in a single package containing the following:
•
An InterChange iQ 2000 or iQ 2000plus unit.
•
Mains cable.
•
Management cable.
•
120 Ohm crossover cable (for use in Cisco networks).
•
Safety Guide with Approvals, Safety Instructions and Statutory Information.
•
Hard Copy Quick Start Guide.
•
CD with Vision iQ and Protocol Application Software, User Guide and
Quick Start Guide.