![Wenglor SB4-I Operating Instructions Manual Download Page 24](http://html1.mh-extra.com/html/wenglor/sb4-i/sb4-i_operating-instructions-manual_956893024.webp)
EN
24
Light Array Operation
Schematic Diagram, Contactor Monitoring
8) Serial Communication
7) Timing
6) Cascading
5) Reduced Resolution
3) Fix Blanking
2) Contactor Monitoring
1) Restart Inhibit
8) Serial Communication
7) Timing
6) Cascading
5) Reduced Resolution
3) Fix Blanking
2) Contactor Monitoring
1) Restart Inhibit
88
2
89
Receiver
Control Panel
Emitter
Control Panel
Socket
Socket
Plug
Plug
Failure (RD)
Normal
Operation (GN)
Enter Button
Enter Button
Failure (RD)
Display 2
Display 1
Blanking
Alignment (YE)
OSSD off (RD)
OSSD on (GN)
Dip-Switch S1
2
1
3
4
4
2
6
1
3
5
7
8
24 V
0 V
Plug Receiver
Plug Emitter
Load
Circuit A
Load
Circuit A
Load
Circuit A
Load
Circuit A
Load
Circuit B
Load
Circuit B
Load
Circuit B
Load
Circuit B
Contactor
Monitor
OSSD 2
0 V
Signal Output
Acknowledgement
OSSD 1
24 V
Earth/Shield
0 V
Earth/Shield
24 V
Connector Pin Assignments for Function Type Contactor Monitoring
Required system components:
1 × transmitter, 1 × receiver
1 × relay unit/external, positively driven relay
1 × connector cable for transmitter
1 × connector cable for receiver