SYSTEM SETUP SCREENS (CONTINUED)
SYSTEM SETUP 9
SYSTEM SETUP 9 - Regeneration control
Delayed 1 – 4
• Delays regeneration of units upon reaching 0 gallons capacity
• Allows setting of up to 4 regeneration windows per day
• Systems with delayed regen will remove a unit from service based upon 0 capacity and
regenerate at the scheduled regen time.
- Any unit needing regeneration while the window of time is available will be able to
regenerate. Only one unit will regen at a time
• Day driven regens will regen at the Delayed 1 window time
• Depleted units will regen at the next available delayed time slot
Immediate
-Immediate regeneration of units upon reaching 0 capacity
-Series regeneration systems set to Immediate will sequentially regenerate all units at the
delayed time based on day override
SYSTEM SETUP 10
SYSTEM SETUP 10 – Automatic reserve calculation
This screen will not display on units set to Immediate, capacity set to Off, or any multi-unit
systems
On: Unit will regenerate before reaching 0 capacity, based on previous usage trends
Requires delayed regeneration
OFF: Regeneration is scheduled after reaching 0 capacity
SYSTEM SETUP 11
SYSTEM SETUP 11 - Auxiliary Input
OFF
• Auxiliary input is disabled
REGEN DELAYED
• Control will immediately schedule a regen upon switch closure
• Systems follow “Delayed Logic” regenerating fl agged units in available time slots
TIME REGEN DELAYED
• Control will immediately schedule a regeneration upon accumulating 2 minutes of
intermittent switch closures
• Systems follow “Delayed Logic” regenerating fl agged units in available time slots
START REGEN
• Control will start an immediate regeneration upon switch closure
• Systems follow “Immediate logic” regenerating all fl agged units sequentially
START REGEN TIME
• Control will immediately regenerate upon accumulating 2 minutes of intermittent switch
• Systems follow “Immediate logic” regenerating all fl agged units sequentially
HOLD REGEN
• Regeneration will not be allowed as long as there is switch closure
- On0 units will regenerate immediately after the hold switch opens
- Delayed regenerations will be delayed until the next scheduled time if the hold is active
when the scheduled time passes
LEVEL INPUT
• Only available on single units
• External switching can be used to control the On Line / Standby status
- Switch closure will trigger the unit to go to a standby condition