Setup
14
Wasp WDI7500/WWS750
Configuring the Vertical Base Station
Installation
To set up your WWS750-BS cradle you must:
1. Physically install the cradle.
2. Make all system connections.
3. Configure the WWS750-BS cradle.
The cradle package contains the following items:
• WWS750-BS Presentation Base
• Hex Key
• WWS750-BS Quick Reference Guide
• Rubber Spacers
• Metal Mounting Plate
Regulating the Cradle Position
To regulate the position, use the hex key to unscrew the holder and slide it
to the desired position.