-
-
-
-
05.09
2
TO.920
M.
ILV
ILVC
ILVB
ILVB
ILVB
ILVA
ILVA
ILVA
ILVC
"L"
09
INSTALLATION - APPLICATION
INSTALLATION - ANWENDUNG
MISE EN PLACE - APPLICATION
INSTALLAZIONE - APPLICAZIONE
Distance
Distance
Distance
Distance
Distance
“Full load”
indicator
Random
switching
points
can be
preset
“Empty” detector
Pay attention
to the maximum torque
Bulk materials
flow more easily
if there is a slight
slope
(recommended)
In case of applications in the open,
install the recommended sun roof
covering (particularly in the pres-
ence of high temperatures)
sensitive
area
Distance from
wall and
from depots
PG connection
facing downwards:
- to prevent possible
water seepage
- for correct orienta-
tion of the oscillat-
ing arms
Steel angle bar in the presence of
high load (distance approx. 200mm)
Very large operating surface over-
loaded during falling of material dan-
ger of formation of encrustation and
deposits
Correct
Incorrect
Recommendations for installation
Switching point:
heavy bulk material cover by a few mm
light bulk material cover by a few mm
Do not bend, shorten or lengthen the oscillating rods as there is risk of breakage of the device.
Installation of the device by screwing:
use a 50 mm double fixed wrench (do not rotate the body).
In case of high lateral load: check the possibility of lateral installation, instead of installation on the top, with an extension device (ILVB).
Observe the maximum traction force
also communicated to the silo roof