Splitter Log
Chute
Fig. 23 –
Splitter log chute
13.
Finally, adjust the splitter chute to the required
height, crank the bracing jacks so they are firmly
on the ground, but ensure the front lip of the lead in
chute is on the ground (to avoid catching on logs).
If required, adjust the 3 point hitch so the lead in
chute is level with the ground and the bracing jacks
have a firm grip.
14.
Move the wagon, trailer or conveyor into position
under the discharge chute if desired or appropriate
for your application.
15.
Reverse the above procedure when preparing to
leave the work site or transporting.
WP240-WP270
3-Point Hitch Firewood Processor
Operation
37
Summary of Contents for WP240
Page 19: ...WP240 WP270 3 Point Hitch Firewood Processor Safety Safety 19...
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ...www wallensteinequipment com...