THP 94/42 R 4 XXT
THP 125/42 R 4 XXT
THP 140 H/42 R 4 XXT
GB-07.2005
7-13
•
Press control lever D (Item 5, Fig. 7.11) and
deploy boom element D at 90º to boom
element B.
•
Position boom element D horizontally
approx. 1 m above the ground.
•
Open the discharge hose retainer (arrowed)
and release the discharge hose.
•
Use the control levers (Items 5 to 9, Fig.
7.11) on the boom control block to move
the distributor boom into the desired
working position.
WARNING:
When using manual control at the boom control block all safety circuits
including Emergency Stop are disabled.
7.4.1.1
Back-up slewing function
If the controls system fails, slewing the boom must be enabled by engaging the additional back-up controls (Item
X, Fig. 7.11) by inserting a suitable screwdriver (4 mm) into the holes in the cover and pushing.
Fig. 7.16 Deploy boom element D
WARNUNG
Fig. 7.17 Release the discharge hose