S
TARTING
UP
AND
OPERATING
C
HAPTER
7
THP 94/42 R 4 XXT
THP 125/42 R 4 XXT
THP 140 H/42 R 4 XXT
GB-07.2005
7-11
•
Press control lever boom A (Item 8, Fig.
7.11) and deploy the boom package until
the catch hook releases.
•
Press the boom rotation control lever (Item
9, Fig. 7.11) to rotate the boom package
into the working position.
Catch hook released
Fig. 7.12 Deploy the boom package, the catch hook releases
Fig. 7.13 Slew the boom package into the working position