Setting up the truck-mounted concrete pump
Select the location having regard to the safety instructions in section 2.7, and drive the machine to the location.
NOTE:
Be sure to allow sufficient space for setting up truck-mounted concrete
pump! Allow additional space for the mixer truck also!
On sloping ground put chocks behind the wheels, release the brakes and allow the truck-mounted concrete
pump to roll back on to the chocks. Then apply the handbrake and extend the outriggers.
The ground must be checked for its load-bearing capability.
Fully deployed outriggers right:
Space requirement at the front: 8,5 m + 0, 6 m = 9,1 m
Space requirement at the rear: 8,0 m + 0, 6 m = 8,6 m
Slewing range:
0
°
- 360
°
Narrow outriggers one side:
Space requirement at the front: 6,1 m + 0, 6 m = 6,7 m
Space requirement at the rear: 5,7 m + 0, 6 m = 6,3 m
Slewing range:
0
°
- 200
°
oder 360
°
- 160
°
Narrow outriggers on both sides:
Space requirement at the front: 3,7 m + 0, 6 m = 4,3 m
Space requirement at the rear: 3,4 m + 0, 6 m = 4,0 m
Slewing range:
160
°
- 200
°
CAUTION: Narrow outriggers may only be used when XXA
controls are installed and in use!
CAUTION: Narrow outriggers may only be used when XXA
controls are installed and in use!
8,500
0.6 m for outrigger plates
0.6 m for outrigger plates
0.6 m for outrigger plates
6,100
3,700
8,000
5,700
3,400
Fig. 7.2 Space requirement for outriggers for the truck-mounted concrete pump