WAGO-I/O-SYSTEM 750
Run-time System CODESYS 2.3 237
750-8207 PFC200 CS 2ETH RS 3G
Manual
Draft version 1.2.1 from 2017-09-13, valid from FW Version 02.06.20(09)
3.
To assign a new name to the task (e.g. PLC_Prog), click on “New Task”.
Then select the type of task. In this example, this is the “cyclic” type.
Observe the cycle time!
The minimum cycle time for I/O-based tasks is 2 milliseconds (ms)!
Figure 72: Changing Task Names 1