Transportation
5.3 Tying Down and Transporting the Machine
30
Operator’s Manual | RTLx-SC3 | 5100061327 | 09/2022 | [en-US]
Procedure
1.
Make sure that the transport vehicle is capable of handling the weight
and size of the machine. For dimensions and operating weight,
Technical Data on page 83
.
2.
Lock the front and rear halves of the machine using the articulated joint
locking bar
(1)
.
wc_gr012168
1
2
3
3
Fig. 4: Preparing the machine for transportation
3.
Place chocks
(2)
in of front or behind each drum as shown.
4.
Attach steel ropes or chains to the front and rear tie downs
(3)
.
5.
Attach the other end of the steel ropes or chains to the transport vehi-
cle.
Summary of Contents for RTLx-SC3
Page 6: ...This page is intentionally left blank...
Page 89: ...Index 89 en US 09 2022 5100061327 RTLx SC3 Operator s Manual...
Page 92: ...Cette page est laiss intentionnellement vierge...
Page 183: ...Index 183 fr 09 2022 5100061327 RTLx SC3 Notice d utilisation...
Page 184: ......
Page 185: ......