Vertical Digging System live ring gear (option)
DANGER
Crushing hazard during lubrication!
Will cause severe injuries or death.
►
Park the machine as shown in
►
Do not rotate the upper carriage.
►
Do not tilt the upper carriage.
The lubrication point is located at the right on the console.
1. Park the machine on firm, level and horizontal ground.
2. Lower the stabilizer blade to the ground.
3. Lower the boom and the stabilizer blade to the ground.
4. Stop the engine, remove the starting key and carry it with you.
5. Apply grease to lubrication point
12
with five strokes of the grease gun.
6. Start the engine, raise the boom and the stabilizer blade.
7. Rotate the upper carriage by 90°.
8. Repeat steps 2 – 7 three times until the upper carriage is back in its
initial position.
Fig. 239
12
Fig. 240
Summary of Contents for EZ38
Page 12: ...1 6 OM EZ38 us 1 1 ez38v100 fm 1 Notes ...
Page 38: ...3 10 OM EZ38 us 1 1 ez38e300 fm 3 Warning labels Fig 13 ...
Page 43: ...OM EZ38 us 1 1 ez38e300 fm 3 15 3 Labels Fig 29 ...
Page 156: ...5 60 OM EZ38 us 1 1 ez38b510 fm 5 Notes ...
Page 244: ...9 24 OM EZ38 us 1 1 ez38t900 fm 9 Dimensions Overview EZ38 ...
Page 246: ...9 26 OM EZ38 us 1 1 ez38t900 fm 9 Overview EZ38 VDS ...