7-22
OM EZ38 us 1.1 * ez38w700.fm
7
7.6
Lubrication work
Preparing lubrication
1. Stop the machine on firm, level and horizontal ground.
2. Position the boom straight ahead at the center of the machine.
3. Lower the boom and the stabilizer blade to the ground.
4. Stop the engine.
5. Operate the control lever repeatedly to release the pressure in the
hydraulic system.
6. Raise the control lever base.
7. Remove the starting key and carry it with you.
8. Safely store all loose objects inside the machine.
9. Close the windows and doors.
10.Close and lock all covers.
11.Attach a warning label to the control elements (for example “Machine
being serviced, do not start”).
12.Wait at least 10 minutes after stopping the engine!
Fig. 233
Summary of Contents for EZ38
Page 12: ...1 6 OM EZ38 us 1 1 ez38v100 fm 1 Notes ...
Page 38: ...3 10 OM EZ38 us 1 1 ez38e300 fm 3 Warning labels Fig 13 ...
Page 43: ...OM EZ38 us 1 1 ez38e300 fm 3 15 3 Labels Fig 29 ...
Page 156: ...5 60 OM EZ38 us 1 1 ez38b510 fm 5 Notes ...
Page 244: ...9 24 OM EZ38 us 1 1 ez38t900 fm 9 Dimensions Overview EZ38 ...
Page 246: ...9 26 OM EZ38 us 1 1 ez38t900 fm 9 Overview EZ38 VDS ...