Putting the machine into operation for the first time and running-in period
Before putting the machine into operation for the first time, check it
visually for exterior damage due to transport, and check whether the
equipment supplied with the machine is complete.
•
Check the fluid levels according to chapter “Maintenance”.
Each machine is correctly adjusted and checked before it is delivered.
Handle the machine carefully during its first 50 operating hours.
•
Do not load a cold engine.
•
Warm up the machine at low engine speed and little load, do not warm
it up at a standstill.
•
Do not change engine speed abruptly.
•
Avoid using the machine under heavy loads or at high speeds.
•
Avoid abrupt acceleration, braking and changing traveling direction.
•
Do not run the engine at high speed for extended periods.
•
Strictly observe the maintenance plans and perform (or have
performed) the mandatory maintenance on or with the machine
–
see chapter “7.2 Maintenance overview” on page 7-2
.
Traveling on public roads
Information
The machine is not certified for travel on public roads.
Summary of Contents for EZ17
Page 12: ...1 6 OM EZ17 us 1 0 ez17v100 fm 1 Notes...
Page 38: ...3 10 OM EZ17 us 1 0 ez17e300 fm 3 Warning labels Fig 11 symbolic representation...
Page 43: ...OM EZ17 us 1 0 ez17e300 fm 3 15 3 Labels Fig 24 symbolic representation...
Page 48: ...3 20 OM EZ17 us 1 0 ez17e300 fm 3 Notes...
Page 138: ...5 56 OM EZ17 us 1 0 ez17b510 fm 5 Notes...
Page 146: ...6 8 OM EZ17 us 1 0 ez17t600 fm 6...
Page 198: ...7 52 OM EZ17 us 1 0 ez17w710 fm 7 Notes...
Page 202: ...8 4 OM EZ17 us 1 0 ez17b800 fm 8 Notes...
Page 222: ...9 20 OM EZ17 us 1 0 ez17t900 fm 9 Dimensions Overview EZ17 Fig 227...