7-48
OM EZ17 us 1.0 * ez17w710.fm
7
7.18 Tires/tracks
Information regarding the tracks
Track wear can vary according to work and ground conditions.
Checking track tension
WARNING
Crushing hazard when working under the machine!
Working under the tracks can cause severe crushing or injuries resulting
in death.
►
Ensure that no one is in the danger zone.
1. Place the machine on firm, level and horizontal ground.
2. Raise the machine evenly and horizontally by means of the boom and
the stabilizer blade.
➥
Raise the machine so as to allow the tracks to sag freely.
3. Place the tracks so that mark
A
is in the middle between drive pinion
B
and track tension roller
C
.
4. Stop the engine.
5. Operate the control lever repeatedly to release the pressure in the
hydraulic system.
6. Raise the control lever base.
Fig. 215
Fig. 216
C
B
A
A
Summary of Contents for EZ17
Page 12: ...1 6 OM EZ17 us 1 0 ez17v100 fm 1 Notes...
Page 38: ...3 10 OM EZ17 us 1 0 ez17e300 fm 3 Warning labels Fig 11 symbolic representation...
Page 43: ...OM EZ17 us 1 0 ez17e300 fm 3 15 3 Labels Fig 24 symbolic representation...
Page 48: ...3 20 OM EZ17 us 1 0 ez17e300 fm 3 Notes...
Page 138: ...5 56 OM EZ17 us 1 0 ez17b510 fm 5 Notes...
Page 146: ...6 8 OM EZ17 us 1 0 ez17t600 fm 6...
Page 198: ...7 52 OM EZ17 us 1 0 ez17w710 fm 7 Notes...
Page 202: ...8 4 OM EZ17 us 1 0 ez17b800 fm 8 Notes...
Page 222: ...9 20 OM EZ17 us 1 0 ez17t900 fm 9 Dimensions Overview EZ17 Fig 227...